HomeServicesLoft Conversion
// UK RESIDENTIAL ARCHITECTURAL SERVICES

Loft Conversion

Hip-to-gable and rear dormer loft conversions

Loft Conversion — example project by The Studio Arch
TECHNICAL DRAWING PACKAGE
1:50 / 1:100 SCALE

1. Service Overview & Scope

Transform your unused loft space into a comfortable, functional and beautifully designed living area with our professional loft conversion drawing services. We specialise in Hip-to-Gable and Rear Dormer loft conversions, creating practical layouts while maximising the available roof space. Our team prepares detailed architectural drawings covering the existing and proposed layouts, roof alterations, Hip-to-Gable extension, Rear Dormer addition, floor plans, elevations and sections. We also provide Planning Drawings and Building Regulation Drawings to support your project from the initial design through to construction.

2. Package Deliverables Checklist

INCLUDED AS STANDARD
Existing & Proposed Floor Plans (1:50 / 1:100)
Existing & Proposed Elevations (1:50 / 1:100)
Existing & Proposed Sections
Roof Plan
Building Regulations Drawings & Specification Notes (where ordered)

3. Technical Compliance & Specifications

  • Fully Compliant with Local Authority Submission Standards
  • Native DWG & High-Resolution Vector PDF Export

4. Who This Service Is Ideal For

Homeowners adding a bedroom or en-suite in the roofHip-to-gable and rear dormer conversionsBuilders needing a Building Regs pack

5. Loft Conversion FAQs

Many hip-to-gable and rear dormer lofts fall under Permitted Development, subject to volume limits (typically 40m³ for terraced and 50m³ for semi-detached or detached houses) and other conditions. Flats, conservation areas and houses with PD rights removed need full planning permission. We check your property and advise which route applies, and can prepare a Lawful Development Certificate application.
// FIXED-FEE QUOTE

Request Loft Conversion Quote

Send your sketches, property photos, or dimensions for a fixed-fee quote within 24 hours.

FIRST DRAFTS IN 3–5 WORKING DAYS
DRAWN TO LPA & BUILDING REGS STANDARDS